Heat pump installations in the UK have already exceeded last year’s total, setting a new milestone for the Microgeneration Certification Scheme (MCS) with three months still to go in 2024. By the end of September, 42,000 installations were completed—outpacing 2023's total by approximately 4%.
How Could The Labour Party Impact The Heat Pump Market?
With the UK election out the way and a new government in place, we feel it’s important to explore the potential implications for the heat pump market now that Labour has taken the helm. For plumbers, particularly those considering diversifying into heat pump installations, Labour's anticipated measures could present significant opportunities in the evolving green energy sector.
Heat Pump Adoption Crucial To Meeting Net Zero Targets
The UK remains overly dependent on natural gas, according to the National Infrastructure Commission (NIC), which provides independent recommendations to the government.
In its recent annual assessment, the NIC highlights the urgent need to reduce reliance on high-cost, high-carbon natural gas and accelerate the adoption of heat pump technology to meet the ambitious net zero targets by 2050. According to the Commission, decarbonising buildings is a critical aspect of this transition and represents the single biggest challenge on the path to net zero.
Boiler Upgrade Scheme Confirmed Changes
Homeowners Open Doors To Their Heat Pump Installations
Government Removes Insulation Prerequisites For Boiler Upgrade Scheme Grant
Last month, the UK government unveiled changes to the Boiler Upgrade Scheme, making it easier for households to install eco-friendly heating solutions like heat pumps. The update involves the removal of insulation prerequisites for heat pump grants, a move designed to simplify installations and reduce costs for households.
Installers Beware: The Risks of Neglecting MCS Compliance
In the heat pump market, compliance with industry standards is paramount. One crucial standard is the Microgeneration Certification Scheme (MCS), which is specifically designed to ensure the efficiency and reliability of renewable energy technologies like heat pumps. In this blog post, we’ll delve into the risks associated with neglecting MCS compliance, and why plumbers should prioritise installing an MCS certified heat pump.
Heat Pump & Hot Water Cylinder Range - stock available this Autumn & Winter!
The last few Autumns and Winters really have been a bit crazy when it comes to heat pump and hot water cylinder stock. Before the pandemic hit, most manufacturers had no ongoing stock issues however from 2020 onwards there has been a dramatic change, meaning we can no longer assume there will never be any issues with the supply chain. We therefore decided to make a big change to our distribution strategy. We extended our warehouse capacity so that we could significantly increase the quantities of both heat pumps and hot water cylinders from various manufacturers so that we could hold in stock ourselves.
Introducing The Alto Assured Heat Pump Installer Scheme
Following the start of the Boiler Upgrade Scheme grant for heat pumps, Alto Energy is excited to launch their new Alto Assured Heat Pump Installer Scheme at this year’s Installer Show at the NEC in Birmingham. The new scheme provides the best way for installers to quickly gain access to the heat pump market and install properly designed and commissioned heat pump systems.